G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Product Details
Customization: Available
After-sales Service: Reply as Soon as Possible
Warranty: 1 Year
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (21)
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
  • G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
Find Similar Products
  • Overview
  • Introduction
  • Product Parameters
  • Operating Principle
  • Application
  • Company Profile
  • Packaging & Shipping
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
VBCD-G12-DE A
Type
Hydraulic Fittings
Application
Excavator
Certification
CE, ISO9001: 2000
Condition
New
Package Way
Carton+Wooden Box
Channel Position
Two-Way Type
Main Material
Cast Steel
Applicable Temperature
-20ºC-80ºC
Flow Direction
Bi-Directionality
Operating Temperature
Normal Temperature
Category
Control Valve
Stressful Environment
High Pressure
Transport Package
Wooden Box
Specification
G1/2
Trademark
YiKDE
Origin
China
HS Code
8481201090
Production Capacity
30000 PCS Each Year

Product Description

G1/2 Control Valve Hydraulic Balance Valve for Aerial Work Vehicle

Introduction

A hydraulic balance valve is an essential component within hydraulic systems, particularly in applications where precise control over the movement of loads is critical, such as construction machinery and industrial equipment. This valve is designed to regulate the flow of hydraulic fluid in response to changes in load conditions, ensuring that the system maintains stability and operates smoothly.

The primary function of a hydraulic balance valve is to balance the pressure of the return oil with the changing load, enabling the load to stop reliably at predetermined positions. This is achieved by adjusting the flow of hydraulic fluid in the system, thus controlling the speed and direction of movement.

In addition to providing precise control over load movement, hydraulic balance valves also play a crucial role in preventing damage to structural and hydraulic components. By regulating pressure and flow, they help mitigate the risk of sudden drops in load, which can cause excessive stress on the system and lead to equipment failure.

Overall, hydraulic balance valves are indispensable for ensuring the safe and efficient operation of hydraulic systems, offering precise control, stability, and protection against potential damage.
G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles
G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Product Parameters

Model VBCD-G12-DE A
Max Pressure 31.5Mpa
Max Flow 60L/min
Pilot Ratio 1:4.25

Operating Principle


G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Application

G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Company Profile

G1/2 Hydraulic Balance Control Valve for Aerial Work VehiclesG1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Packaging & Shipping

G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

After Sales Service

G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

FAQ

Our company, Shandong Yikaide Hydraulic Co., Ltd., is a distinguished manufacturer authorized to import and export premium hydraulic cylinders. Below are pivotal details about our offerings:

  • Delivery Time: 5-10 days if in stock; 30-40 days if out of stock
  • Samples: Available upon request (charges apply)
  • Payment Terms: Orders below $1000 require 100% prepayment; Orders above $1000 require a 30% T/T advance with the balance due before shipment.
G1/2 Hydraulic Balance Control Valve for Aerial Work Vehicles

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier